Solution for peak shaving and valley filling in the power grid
Relying on large capacity energy storage power stations, storing electricity during low load periods and discharging during high load periods. Effectively peak shaving by 15% -30%, alleviating transmission channel congestion, delaying investment in power grid expansion, reducing power grid renovation costs, and ensuring regional load supply-demand balance.
Fast frequency regulation and voltage stabilization scheme for power grid
Fast response to frequency and voltage fluctuations in the power grid, with a response delay of ≤ 100ms. Accurately smoothing out power grid disturbances, with a frequency modulation accuracy of ± 0.02Hz, improving power grid stability and adapting to high penetration grid connected scenarios of new energy.
New energy grid connected consumption solution
Adapting to wind and photovoltaic centralized power stations, supporting energy storage, the on-site consumption rate of new energy is increased by more than 25% after energy storage expansion, and the wind and solar power curtailment rate is reduced to less than 3%, helping to promote the large-scale integration of clean energy into the grid.